Chavonne Hydroelectric Power Plant

Chavonne (Italy)
CLIENT:
CVA
Work activities:
Detailed design
Place:
Chavonne (Italy)
Period:
2023 - 2025
 

Overview

Chavonne hydro power plant is located in the Alps, within Valle d’Aosta region. The project involves the complete refurbishment of the hydroelectric plant. The scope of work assigned to Alpina includes: 2 barrages and intakes on Savara creek and Grand Eyvia creek; 2 free surface hydraulic tunnels: “La Nouva – Fenille” (diameter ~3,90m, length 6886m) “Fenille – Poignon” (diameter ~4,50m, length 6260m) forebay tank; emergency overflow, consisting in a free surface channel; penstock (length 1500m; diameter DN2000mm-800mm, head 647m); powerhouse; 4 turbine/generator units – total installed 80 MW; 1 transformer unit with connection cables to the local electric network. environmental mitigation and monitoring measures. The total cost of the works amounts to approximately 230 million euros.

Capitale Sociale € 1.155.170 interamente versato
C. F. e iscrizione al Registro Imprese di Milano 01033390392
REA 1337939
Partita IVA 10241540151

crossmenuchevron-down