A1/E35 Motorway – Four lanes functional upgrade section Milan sud – Lodi, 18 Km (Italy)

LODI (ITALY)
CLIENT:
SPEA S.p.A.
Work activities:
Detailed design
Place:
LODI (ITALY)
Period:
2017- 2018
 

Overview

Detailed design of the functional upgrade to full four lanes of the existing motorway,  section from Milano Sud Junction (Km 4+852) to Lodi Junction (22+306), approximately 18 km.

The works includes the detailed design of the new four lanes motorway, the re-alignment of A50 interchange speed ramps, the Melegnano-Binasco junction, the A58 TEEM interchange, the Lodi junction, the S. Zenone gas station speed ramps,  five bridge extension (new decks and abutments) including the major one above  Lambro river, the extension of n°45 culverts of the secondary hydraulic system, the new road drainage system, the installation of acoustic barriers and safety barriers.  

No ACF gallery field data found

Capitale Sociale € 1.155.170 interamente versato
C. F. e iscrizione al Registro Imprese di Milano 01033390392
REA 1337939
Partita IVA 10241540151

crossmenuchevron-down