Skip to content

Nakra 1 & 2 hydroelectric plants – (Georgia)

ClientEcohidro

Work activitiesDetailed design

PlaceGEORGIA

Period2019 - ongoing

Credits-

Overview

Engineering Services for the preparation of the Basic and Detailed Design Projects of Nakra 1&2 HPP

The project consists in the construction of a 8.7 MW cascade Hydroelectric Plant. The plants consist of:

Nakra 1

  • A lateral intake equipped with trash racks, settling basin and forebay tank
  • A steel penstock, 1680 m long, 2 diameters (1.3 – 1.2 m)
  • A powerhouse with 2 Francis turbine units 3.7 MW
  • A service road 1680 m long

Nakra 2

  • A lateral intake equipped with trash racks, settling basin and forebay tank,
  • A steel penstock, 1900 m long, 2 diameters (1.3 – 1.4 m)
  • A powerhouse with 2 Francis turbine units 5.0 MW
  • A service road 1900 m long

Similar Projects