Engineering services for the Preliminary and Final design of the functional upgrade of the existing urban motorway junction at Genoa San Benigno – Lot 2 – Section D and E.
The services include the new horizontal and vertical alignment of existing S. Benigno junction ramps, connections with local roads, access to the main Port areas, the diversion of the existing railway line (120 m) and the design of new major structures: n°3 concrete viaducts, embankments & trenches, hydraulics works, site construction phases.