New LinkedIn campaign starts today!

Our new communication campaign starts today!
Find out the main campaign’s themes:

– Be ALPINA! – corporate values and identity
– ALPINA Solving – case histories, accomplished projects
– ALPINA Pulse – technical and in-depth articles
– ALPINA Informs – News about events, conferences and much more

Stay in touch!

https://www.linkedin.com/company/alpina-s-p-a/

AWTIP MANILA PHILIPPINES – WATER SUPPLY TUNNEL

On February 10th  6.5 km TBM water supply tunnel has been fully excavated from Bigte to IPO Dam Reservoir in Metro Manila Region area.

A challenging design came to the end of its realization 2 months in advance on the scheduled time!

Happy to have been part of it!

LYON – TURIN BASE TUNNEL

On September 23rd 2019 Federica, the 11.26 m diameter TBM, successfully completed the excavation of the first 9 km section between St-Martin-la-Porte and La Praz, which is part of the 57.5 km Lyon-Turin base tunnel.

Alpina celebrates this important milestone thanks to the competence and skill of her on-site Supervision Team!

PORTONOVI – MONTENEGRO

Alpina celebrates a long and successful project: after 5 years of hard work, in 2019 Portonovi Montenegro comes to reality: 250.000 sm of top class resort area, 2 km of new coastline, a new 220 berths Marina, luxury residential buildings.

Proud to be the designers of it!

Portonovi Resort in Kumbor (Montenegro)

PORTONOVI RESORT IN KUMBOR

Montenegro new life style

ClientAzmont Investment doo

Work activitiesConceptual, Preliminary and Detailed design

PlaceKumbor (Montenegro)

Surface26 ha; 1,7 coastline km

Period2014 – 2019

Project value€ 500 ml

Overview

A world class resort comprised of 5 stars One & Only Hotel, high end residential units (villas & apartments), a yacht marina situated on a former Navy base. The site has a surface of 26 hectares and has about 1,7 km of coastline. The site is located in Herceg Novi bay. Alpina is developing the Preliminary design (Idejni Projekat) and the Detailed design (Glavni Projekat) of: hydrology and hydraulics, ground improvement, traffic, roads & parking, drainage and water storm, services utilities (sewage, water supply, energy& telecommunication, heating & cooling), Lower village structures and MEP, Marina Apartments structures and MEP, Fisherman Wharf’s structures and MEP, marina works and coastal edge.

Similar Projects